Elster Grid Entry Unit set up for SGN Spec, 1100Sm3/hour – Immaculate condition
This Grid Entry unit is avilable form a UK Biogas plant which has closed down and is being dismantled.
Built 2019, was injecting until 2024.
Correctly preserved by site owners, still energised.
All documentation preset and correct.
Includes “Time of Flight” pipework and ROV kiosk
Design Parameters:
Inlet Pressure: 7.5Barg
Outlet Pressure: 1.4 Barg
Flow rate: 150 – 1100 Sm3/hr
Design temperature: -20 to +50degC
Inlet temperature: +10 – +15degC
Outlet Termperature: 0 – +20degC
Please call to arrange an inspection or for additional information and photographs
Location: SE England