Grid Entry Unit – Elster 1100Sm3/hr SGN Spec – Immaculate Condition – Fully operational

£350,000.00

Enquire Now

    Description

    Elster Grid Entry Unit set up for SGN Spec, 1100Sm3/hour – Immaculate condition

    This Grid Entry unit is avilable form a UK Biogas plant which has closed down and is being dismantled.

    Built 2019, was injecting until 2024.

    Correctly preserved by site owners, still energised.

    All documentation preset and correct.

    Includes “Time of Flight” pipework and ROV kiosk

    Design Parameters:

    Inlet Pressure: 7.5Barg

    Outlet Pressure: 1.4 Barg

    Flow rate: 150 – 1100 Sm3/hr

    Design temperature: -20 to +50degC

    Inlet temperature: +10 – +15degC

    Outlet Termperature: 0 – +20degC

    Please call to arrange an inspection or for additional information and photographs

    Location: SE England

    Available Immediately