Description
Hitachi 3-Stage Membrane Biogas Upgrading System, 700m3/hr biogas inlet, Evonik Sepuran Membranes ***Full Package***
Biogas upgrading system including complete scope of supply. First-class components, ready to work. genuine reason for sale.
Built 2014, full working order. Complete scope available for easy relocation.
Evonik Sepuran Membranes arranged in 3 stages
Specific power consumption appx. 0.26kWh / Nm3 biogas upgraded
Sale includes following Equipment:
Carbon packs for desulphurisation mounted on gantry with hoist for easy carbon changes
Biogas Chiller / Dehumidification System
Continental biogas booster
Containerised Hitachi membrane upgrading system with complete control system and 3-stages of membranes
Adicomp VG160 compressor in separate enclosure
Biomethane delivery pressure: 12-14barg
+++
System is currently feeding a SAFE 3-Stage 250bar compressor for loading trailers for virtual pipeline application. This compressors is available as a separate sale. Please enquire.
Location: Ireland
Closest Airport: Dublin
Closest Sea Port: Dublin
Available immediately
Buyer to remove
Please call to arrange an inspection















